Education

Education

UNL Selleck Dining Hall

The overall feel of the Selleck Dining Hall is different from most spaces on UNL’s campus. Students will notice a lack of televisions and the Huskers’ signature red. Instead, the idea was to have a more natural feel by incorporating curved architecture, accents, and neutral colors. Another highlight is the Nebraska state symbols utilized, such as the Western Meadowlark, Goldenrod flower, and honeybees. An open fireplace with Nebraska’s hydrological map wrapped around it is a final aesthetic touch.

OUR WORK / COMMUNITY

Education

Education
SCC Beatrice Dining Hall
Before 2020, Southeast Community College in Beatrice had only a small Snack Bar area in the Administration Building/Student Union, with limited meal offerings. Erickson Sullivan Architects, along with our subsidiary Foodlines, designed a new 12,000 SF Dining Facility with a scramble servery, full prep kitchen, conference room, and seating for 270 people.
Education
UNL Selleck Skywalks
Elevated skywalks were created to provide an indoor connection to separate wings of the Selleck dormitory, which were previously only connected by exterior fire escape walks. The design provides a glassy, contemporary addition that ties into the aspects of the existing building.
Education

LPS Lefler Middle School

This middle school project includes a 1,950 SF cafeteria addition to expand seating capacity and interior renovations to the Art, Family Consumer Sciences (FCS), and Career and Technical Education (CTE) areas. Two new family restrooms are also incorporated into the renovation. Site work entailed a traffic flow study and parking lot paving.

Education
LPS Pershing Elementary School Addition

Renovations at Pershing Elementary School consisted of adding a third kindergarten room and creating new administration spaces (including a main entrance and lobby, offices for the principal and vice-principal, a health office, and a conference room). An existing, underutilized auditorium was remodeled into an open media center and computer lab, while the existing media center was converted into a new music room with space for practice and storage.

The entire building was renovated to include new flooring, efficient windows and doors, new ceilings, lighting and plumbing fixtures, and geothermal mechanical systems. These upgrades required two mechanical room additions.

Education
LPS Morley Elementary Addition

The project’s first phase was the addition of two new kindergarten rooms, three standardized classrooms, and restrooms. Additionally, the administration and office spaces were placed at the front of the education building to monitor traffic.

The second phase included a full Indoor Air Quality (IAQ) and codes renovation and upgrades to electrical and lighting systems and plumbing fixtures. A new sloped roof was added to house the required mechanical equipment.

View Other ESA Projects

Hospitality

Adaptive Reuse

Private